Title Owner Updated

Urbantide test examples Shared

examples description

3 No licence known
JSON

Urban Tide 2022-01-28

Living Lab 18-19 Home Model - Eden 1-5 Shared

This is open data, we are presenting it as shared for beta testing purposes.

3 No licence known
JSON

Urban Tide 2022-01-28

Electrical half hourly raw and cleaned datasets for Great Britain from 2009-11-05 Shared

Cleaned and raw data sets for Great Britain's public electrical system. From publicly available data.

2 No licence known
JSON

University of Birmingham 2022-01-28

Real-time gas (energy) data for BIS headquarters building Shared

This is open data, we are presenting it as shared for beta testing purposes. Real-time gas (energy) data for the Department for Business, Innovation & Skills headquarters building 1 Victoria Street, London,...

3 No licence known
JSON

Open Energy 2022-01-28

Real-time electricity (energy) data for BIS headquarters building Shared

This is open data, we are presenting it as shared for beta testing purposes. Real-time energy consumption data for the Department for Business, Innovation & Skills headquarters building 1 Victoria Street,...

3 No licence known
JSON

Open Energy 2022-01-28

Real-time electricity (CO2) data for BIS headquarters building Shared

This is open data, we are presenting it as shared for beta testing purposes. Real-time CO2 consumption data for the Department for Business, Innovation & Skills headquarters building 1 Victoria Street, London,...

3 No licence known
JSON

Open Energy 2022-01-28

NGET Pre-applications by Site Shared

Summarised pre-application sizes (in MW) by site split by generation and demand and including technology types

3 No licence known
JSON

National Grid 2022-01-28

NGET Substation Capacity Shared

Available demand and generation headroom at NGET substations, including substation location data.

3 No licence known
JSON

National Grid 2022-01-28

SSEN Embedded Capacity Register data set Shared

The Embedded Capacity Register (ECR) has been developed to provide better information to electricity network stakeholders on connected resources and network requirements. Each Distribution Network Operator...

3 No licence known
JSON

SSE 2022-01-28

Bridgend LAEP Pathways Shared

Pathways data for the Bridgend LAEP substations

3 No licence known
JSON

Passiv UK 2022-01-28

Bridgend LAEP New Heat Demands Shared

New Heat Demands data for the Bridgend LAEP substations

3 No licence known
JSON

Passiv UK 2022-01-28

Bridgend LAEP Load Data Shared

Load Data data for the Bridgend LAEP substations

3 No licence known
JSON

Passiv UK 2022-01-28

Bridgend LAEP Feeder Capacities Shared

Heating System Combinations data for the Bridgend LAEP substations

3 No licence known
JSON

Passiv UK 2022-01-28

Bridgend LAEP Feeder Capacities Shared

Feeder Capacity data for the Bridgend LAEP substations

3 No licence known
JSON

Passiv UK 2022-01-28

Bridgend LAEP Building Connections Shared

Building Connection data for the Bridgend LAEP substations

3 No licence known
JSON

Passiv UK 2022-01-28

Aggregated Substation Energy Per Period Shared

Monthly aggregated data for homes connected to an individul substation providing per-asset energy data broken down into 30-minute periods

2 No licence known
JSON

Passiv UK 2022-01-28

WPD Substation Details Shared

Substation details for the Bridgend WPD substations

3 No licence known
JSON

Passiv UK 2022-01-28

Live GSP Data - West Midlands Open

18 No licence known
CSV

Western Power Distribution 2022-01-28

Live GSP Data - South Wales Open

10 No licence known
CSV

Western Power Distribution 2022-01-28

Live GSP Data - South West Open

11 No licence known
CSV

Western Power Distribution 2022-01-28

Live Data Open

4 wpd-open-data
CSV

Western Power Distribution 2022-01-28

Live GSP Data - East Midlands Open

16 wpd-open-data
CSV

Western Power Distribution 2022-01-28

Interconnector Requirement and Auction Summary Data Open

National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain to help manage system issues such as Rate Of Change Of Frequency (ROCOF), thermal constraints...

4 ESO
Tags: Auction Bid Bidding Britned Gtma Ic Ifa Ifa2 Interconnector Nemo Powerbi Requirement Sch7a Schedule 7a Subscribable Trades Trading
CSV

National Grid ESO 2022-01-27

Day Ahead Wind Forecast Open

The dataset contains national wind forecast over a day ahead timescale as well as all historic day ahead wind forecasts to assist the industry to make efficient decisions in balancing their supply and demand...

2 ESO
Tags: Day-ahead Demand Forecast Metered National Subscribable Wind
CSV

National Grid ESO 2022-01-27

Short Term Operating Reserve (STOR) Day Ahead Auction Results Open

As part of Clean Energy Package (CEP) 6.9 we will be running daily auction for procurement of Short Term Operating Reserve (STOR). The daily results from the auction are available here.

1 ESO
Tags: Cep 6.9 Day Ahead Day Ahead Results Results Stor
CSV

National Grid ESO 2022-01-27

National Carbon Intensity Forecast Open

This dataset contains national carbon intensity forecast for the GB electricity system. The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of electricity...

1 CC-BY-4.0
Tags: Carbon Co2 Forecast Intensity National Subscribable
CSV

National Grid ESO 2022-01-27

Country Carbon Intensity Forecast Open

This dataset contains country carbon intensity forecast for the GB electricity system.The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of electricity...

1 CC-BY-4.0
Tags: Carbon Co2 Country Forecast Intensity Subscribable
CSV

National Grid ESO 2022-01-27

Current Balancing Services Use of System (BSUoS) Charges Open

There is a file for each run type we calculate a BSUoS charge for - Interim Initial (II), Settlement Final (SF) and Reconciliation Final (RF). These are updated daily with the actual Half Hourly BSUoS price....

4 ESO
Tags: Balancing Bsuos Charging Services Subscribable
CSV XLSX

National Grid ESO 2022-01-27

Daily Balancing Services Use of System (BSUoS) Cost Data Open

The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users....

5 ESO
Tags: Balancing Bsuos Cost Daily Historical Balancing Subscribable
CSV

National Grid ESO 2022-01-27

Day Ahead Constraint Flows and Limits Open

A snapshot of the limits and flows at relevant boundaries at day ahead stage. These flow values are true for when the measurement was taken and will not reflect any changes in the flows following the...

3 ESO
Tags: Constraint Day-ahead Diagrams Flow Forecast Limit Network Subscribable
CSV PDF

National Grid ESO 2022-01-27

Balancing Services Adjustment Data (BSAD) Forward Contracts Open

Balancing Services Adjustment Data (BSAD) is used to submit balancing actions to the Balancing & Settlement Code (BSC), which defines the rules and governance for the balancing mechanism and imbalance...

6 ESO
Tags: Adjustment Ancillary Balancing Bsad Cost Service Subscribable
CSV

National Grid ESO 2022-01-27

Regional Carbon Intensity Forecast Open

This dataset contains regional carbon intensity forecast for the GB electricity system.The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of electricity...

1 CC-BY-4.0
Tags: Carbon Co2 Forecast Intensity Regional Subscribable
CSV

National Grid ESO 2022-01-27

Index Linked Contracted Energy Volume Open

Index Linked Contract can be used by National Grid ESO to meet the [voltage requirement](https://www.nationalgrideso.com/transmission-constraint-management?market-information "voltage"). The contract is...

133 ESO
Tags: Balancing Balancing Services Constraint Contract Contract Enactment Fixed Index Index-linked Linked Price Reactive Spread Subscribable Trading Voltage Volume
CSV Unknown

National Grid ESO 2022-01-27

Balancing Services Charging Report (BCR) Open

The Balancing Services Charging Report (BCR) provides a breakdown of the Balancing Services Use of System (BSUoS) charge. There is a BCR for each run type we calculate a BSUoS charge for - Interim Initial...

504 ESO
Tags: Balancing Bsuos Charging Report Services Subscribable
ZIP

National Grid ESO 2022-01-27

Dynamic Containment Data Open

From the 15th September 2021, the auction is run via the EPEX platform. The below files - DC Block Orders Master Data, DC Results by Unit Master Data , DC Results Summary Master Data and DC Linear Orders are...

5 ESO
Tags: Ahead Containment Data Day Dynamic Subscribable
CSV

National Grid ESO 2022-01-27

Daily Balancing Services Use of System (BSUoS) Forecast Open

This file contains the Electricity System Operator's (ESO) half-hourly BSUoS forecast (Balancing Services Use of System charge). The estimated BSUoS charge is calculated by taking the forecast half-hourly...

4 ESO
Tags: Bsuos Daily Forecast Subscribable
CSV

National Grid ESO 2022-01-27

System Operating Plan (SOP) Open

As part of our daily planning processes within the ESO control room, the control room strategy team produces a System Operating Plan (SOP) at key demand peaks or troughs throughout the day, at what we call a...

8 ESO
Tags: Sop Subscribable System Operating Plan
CSV PDF ZIP

National Grid ESO 2022-01-27

Upcoming Trades Open

In order to meet forecast Electricity System Operator (ESO) balancing requirements at minimum cost, ESO trades energy-related products. This dataset displays all upcoming electricity trades due to be delivered...

1 ESO
Tags: Balancing Energy Subscribable System Trades
CSV

National Grid ESO 2022-01-27

Embedded Wind and Solar Forecasts Open

Electricity System Operator (ESO) publishes at a half-hourly resolution the embedded (refer to embedded document for definition) wind and solar forecast from within day up to 14 days ahead. This forecast gets...

2 ESO
Tags: Embedded Forecast Generation Solar Subscribable Wind
CSV DOC

National Grid ESO 2022-01-27

Day Ahead Demand Forecast Open

This dataset contains national electricity demand forecast for day ahead as well as all historic day ahead demand forecasts. The forecast assist the industry to make efficient decisions in balancing their...

3 ESO
Tags: Day-ahead Demand Forecast National Subscribable
CSV PNG

National Grid ESO 2022-01-27

System Inertia Open

This dataset contains an estimate of the outturn inertia and market provided inertia for Great Britain Transmission System.

5 ESO
Tags: Inertia Subscribable System Transmission
CSV

National Grid ESO 2022-01-27

Historic Demand Data Open

This section contains historic electricity demand, interconnector, hydro storage pumping, Non-BM Short Term Operating Reserve (STOR), wind and solar outturn data. **Note**: We are currently...

15 ESO
Tags: Demand Historic Interconnectors Outturn Solar Subscribable Wind
CSV DOC

National Grid ESO 2022-01-27

Historic GTMA (Grid Trade Master Agreement) Trades Data Open

This dataset contains data for historic GTMA (Grid Trade Master Agreement) trades conducted since April 2015. The data includes the trade ID, start and end time and date, the volume in MW, the price in £/MWh...

8 ESO
Tags: Agreement Data Grid Gtma Historic Master Sch7a Schedule 7a Subscribable Trade Trades Trading
CSV

National Grid ESO 2022-01-27

Daily Operational Planning Margin Requirement (OPMR) Open

When assessing and publishing generation availability information against system requirements, Electricity System Operator (ESO) includes an Operational Planning Margin Requirement (OPMR) above the demand...

1 ESO
Tags: Daily Forecast Generation Margin Opmr Powerbi Reserve Subscribable
CSV

National Grid ESO 2022-01-27

Historic Generation Mix & Carbon Intensity Open

This dataset contains data from the 1st of Jan 2009. It has seasonal decomposition applied to correct missing or irregular data points. The carbon intensity of electricity is a measure of how much Carbon...

1 CC-BY-4.0
Tags: Generation Historic Mix Subscribable
CSV

National Grid ESO 2022-01-27

2 Day Ahead Demand Forecast Open

This dataset contains national electricity demand forecast for 2 days ahead as well as all historic 2 day ahead demand forecasts. The forecast assist the industry to make efficient decisions in balancing their...

3 ESO
Tags: 2 Day Ahead Demand Forecast National Subscribable
CSV PNG

National Grid ESO 2022-01-27

Demand Data Update Open

This publication is similar to "Historic Demand Data" dataset but updated on a daily basis with approximately ten days lag in receiving settlement data. In the dataset embedded forecast for the upcoming next 7...

2 ESO
Tags: Embedded Forecast Historic Interconnectors National Demand Solar Subscribable Total System Demand Tsd Wind
CSV DOC

National Grid ESO 2022-01-27

Aggregated Balancing Services Adjustment Data (BSAD) Open

Balancing Services Adjustment Data (BSAD) is used to submit balancing actions to the Balancing & Settlement Code (BSC), which defines the rules and governance for the balancing mechanism and imbalance...

8 ESO
Tags: Adjustment Ancillary Balancing Bsad Cost Service Subscribable
CSV

National Grid ESO 2022-01-27

Non-BM Ancillary Service Dispatch Platform (ASDP) Instructions Open

The Electricity System Operator (ESO) publishes Non-BM Instruction data from its Ancillary Services Dispatch (ASDP) System. This is published near real time publishing data from ASDP every 30 seconds. A new...

19 ESO
Tags: Ancillary Dispatch Instrictions Non-bm Platform Service Subscribable
CSV

National Grid ESO 2022-01-27

Daily & Weekly NRAPM (Negative Reserve Active Power Margin) Forecast Open

This dataset contains NRAPM (Negative Reserve Active Power Margin) forecast for Daily 2-14 days ahead and Weekly for 2-52 weeks ahead for both National and Scotland. The purpose of the NRAPM forecast is to...

4 ESO
Tags: Daily Forecast Margin Nrapm Subscribable Weekly
CSV

National Grid ESO 2022-01-27

2-14 Days Ahead Demand Forecast Open

This dataset contains national electricity demand forecasts for 2-14 days ahead (medium term) as well as all historic 2-14 days ahead forecasts. These forecasts assist the industry to make efficient decisions...

3 ESO
Tags: 2-14 Demand Forecast Medium National Subscribable Term
CSV

National Grid ESO 2022-01-27

Carbon Intensity of Balancing Actions Open

The carbon intensity of balancing actions measures the difference between the carbon intensity of the combined Final Physical Notice (FPN) of machines in the Balancing Mechanism (BM) and the equivalent profile...

2 ESO
Tags: Actions Balancing Carbon Intensity Subscribable
CSV PDF

National Grid ESO 2022-01-27

Super Stable Export Limit Contract Enactment Open

Super Stable Export Limit (SEL) is utilised to directly decrease the sum of the minimum MW level or SEL of generators synchronized to the system by lowering the minimum generating level at a generator...

2 ESO
Tags: Contract Cost Downward Regulation Energy Generation Reserve Subscribable Super Sel Synchronisation
CSV

National Grid ESO 2022-01-27

System Inertia Cost Open

This data set gives indicative values for the average daily price (in £ per GVAs) for BM accepted offers tagged as being for System Inertia. The tagging process identifies the most likely main reason for a...

5 ESO
Tags: Inertia Subscribable System Inertia Transmission
CSV

National Grid ESO 2022-01-27

Weekly Wind Availability Open

This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatt (MW) at a generator level at a weekly resolution for 2-52 weeks ahead. ...

1 License not specified
Tags: Availability Generator Subscribable Weekly Wind
CSV

National Grid ESO 2022-01-27

Firm Frequency Response (FFR) Market Information Open

Firm Frequency Response (FFR) market information reports on the FFR requirement for two months ahead of the publishing month, as well as information on the contracts due to provide in the month following the...

72 ESO
Tags: Balancing Contract Ffr Firm Frequency Market Response Service Subscribable Tender
CSV PDF XLSX

National Grid ESO 2022-01-27

Daily Balancing Services Use of System (BSUoS) Cost Report Open

The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users....

47 ESO
Tags: Balancing Bsuos Cost Daily Report Subscribable
PDF

National Grid ESO 2022-01-27

Disaggregated Balancing Services Adjustment Data (BSAD) Open

Balancing Services Adjustment Data (BSAD) is used to submit balancing actions to the Balancing & Settlement Code (BSC), which defines the rules and governance for the balancing mechanism and imbalance...

9 ESO
Tags: Adjustment Ancillary Balancing Bsad Cost Service Subscribable
CSV

National Grid ESO 2022-01-27

Daily Wind Availability Open

This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatts (MW) at a daily resolution for 2-14 days ahead. ...

1 License not specified
Tags: Availability Daily Subscribable Wind
CSV

National Grid ESO 2022-01-27

14 Days Ahead Wind Forecasts Open

This dataset provides incremental updates for 0-14 days ahead wind forecasts at half hourly level. The forecast assist the industry to make efficient decisions in balancing their supply and demand positions....

1 ESO
Tags: Forecast Medium Subscribable Term Wind
CSV

National Grid ESO 2022-01-27

7 Day Ahead Demand Forecast Open

This dataset contains national electricity demand forecast for 7 days ahead as well as all historic 7 day ahead demand forecasts. The forecast assist the industry to make efficient decisions in balancing their...

3 ESO
Tags: 7 Day Ahead Demand Forecast National Subscribable
CSV PNG

National Grid ESO 2022-01-27

Daily Balancing Services Use of System (BSUoS) Volume Data Open

The BSUoS charge recovers the cost of day-to-day operation of the transmission system. Generators and suppliers are liable for these charges, which are calculated daily as a flat tariff for all users....

5 ESO
Tags: Balancing Bsuos Daily Subscribable Volume
CSV

National Grid ESO 2022-01-27

Balancing Services Contract Enactment Open

National Grid ESO procures [balancing service contracts](https://www.nationalgrideso.com/balancing-services/list-all-balancing-services) to balance demand and supply and to ensure the security and quality of...

4 ESO
Tags: Balancing Services Constraint Contract Enactment Fixed Price Power Reactive Subscribable Voltage
CSV

National Grid ESO 2022-01-27

Short Term Operating Reserve (STOR) Day Ahead Buy Curve Open

As part of Clean Energy Package (CEP) 6.9 we will be running daily auction for procurement of Short Term Operating Reserve (STOR). The Buy Curve used in the daily assessment process is available here.

2 ESO
Tags: Buy Buy Curve Cep 6.9 Curve Stor
CSV TXT

National Grid ESO 2022-01-27

Weekly Operational Planning Margin Requirement (OPMR) Open

When assessing and publishing generation availability information against system requirements, Electricity System Operator (ESO) includes an Operational Planning Margin Requirement (OPMR) above demand forecast...

1 ESO
Tags: Forecast Generation Margin Opmr Reserve Subscribable Weekly
CSV

National Grid ESO 2022-01-27

UKPN_Primary_Postcode_Area Open

Indicative shape file of UK Power Networks Primary substation distribution areas.

4 No licence known
CSV JSON ZIP

UK Power Networks 2022-01-27

Network Headroom Report Open

This dataset indicates the amount of unused network capacity for demand (Demand Headroom) over time on our Grid and Primary substations. It shows where we may need to further reinforce our...

4 No licence known
Tags: Demand Generation Grid Primary
CSV JSON ZIP

UK Power Networks 2022-01-27

NewsFeed Open

Newsfeed Dataset to provide information for the landing page preview window

2 No licence known
CSV JSON

UK Power Networks 2022-01-27

Flexibility HV Zones Open

Flexibility services competition shapefile and zone dataset for HV.For live flexibility services tenders, please visit Dashboard - Piclo...

4 No licence known
Tags: Flexibility Grid Primary
CSV JSON ZIP

UK Power Networks 2022-01-27

LTDS Table 7 Operational Restrictions Open

Long Term Development Statement Table 7 indicates Operational Restrictions in place at...

2 No licence known
Tags: Ehv Grid Ltds Primary
CSV JSON

UK Power Networks 2022-01-27

LTDS Table 4B Earth Fault Level Open

Long Term Development Statement Table 4b shows the earth fault level at each Grid and Primary substation. Published 30th November 2021.

2 No licence known
Tags: Earthing Fault Level Grid Ltds Primary
CSV JSON

UK Power Networks 2022-01-27

132kV Poles Towers Open

A dataset showing the location of UK Power Networks 132kV towers.

4 No licence known
CSV JSON ZIP

UK Power Networks 2022-01-27

Local authorities - UKPN Open

Shapefile showing local authority boundaries within the UKPN area

4 No licence known
CSV JSON ZIP

UK Power Networks 2022-01-27

Grid and Primary Sites Open

List of Active Grid and Primary Sites and key characteristics including spatial coordinates, year commissioned and asset counts against the site.

4 No licence known
Tags: Grid Primary Shapefile Site Location
CSV JSON ZIP

UK Power Networks 2022-01-27

33kV Overhead Lines Open

Shapefile showing UK Power Networks' 33kV overhead lines.

4 No licence known
Tags: Overhead Lines
CSV JSON ZIP

UK Power Networks 2022-01-27

LTDS Table 1 Circuit Data Open

Long Term Development Statement Table 1 shows the circuit associated to each Grid and Primary substation. Published 30th November 2021.

2 No licence known
Tags: Circuits Grid Ltds Primary
CSV JSON

UK Power Networks 2022-01-27

Low Carbon Technologies Open

Volume of Low Carbon Technologies (LCT) for both generation and demand (under 1MW) connected to our network by Primary Substation.

4 No licence known
Tags: Demand Generation Low Carbon Primary
CSV JSON ZIP

UK Power Networks 2022-01-27

LTDS Table 5 Generation Open

Long Term Development Statement Table 5 shows the capacity of existing distributed generation connected at each Primary substation. It also includes a snapshot of accepted connections at...

4 No licence known
Tags: Generation Ltds
CSV JSON ZIP

UK Power Networks 2022-01-27

SPN Ops Boundaries Open

Shapefile showing operational boundaries in the UK Power Networks South Eastern Power...

4 No licence known
CSV JSON ZIP

UK Power Networks 2022-01-27

Grid and Primary Sites EPR Data Open

Earth Potential Rise (EPR) Data by Grid and Primary site

2 No licence known
Tags: Earthing Grid Primary
CSV JSON

UK Power Networks 2022-01-27

LTDS Table 6 Interest Connections Open

Long Term Development Statement Table 6 indicates the level of new connections interest at each Primary substation. Published 30th November 2021.

2 No licence known
Tags: Demand Generation Grid Ltds Primary
CSV JSON

UK Power Networks 2022-01-27

132kV Overhead Lines Open

Shapefile showing UK Power Networks' 132kV overhead lines

4 No licence known
Tags: Overhead Lines
CSV JSON ZIP

UK Power Networks 2022-01-27

Grid and Primary Sites Fault Level Data Open

Fault level data for Grid and Primary, includes 3ph RMS break, 3ph peak make, earth RMS break and earth peak make

2 No licence known
Tags: Earthing Fault Level Grid Primary
CSV JSON

UK Power Networks 2022-01-27

EPN Ops Boundaries Open

Shapefile showing operational boundaries in the UK Power Networks Eastern Power Networks (EPN) area

4 No licence known
CSV JSON ZIP

UK Power Networks 2022-01-27

SPN BOUNDARY Open

Shapefile showing the UK Power Networks licence area South Eastern Power Networks (SPN) boundary

4 No licence known
CSV JSON ZIP

UK Power Networks 2022-01-27

LPN Ops Boundaries Open

Shapefile showing operational boundaries in the UK Power Networks London Power Networks...

4 No licence known
CSV JSON ZIP

UK Power Networks 2022-01-27

LTDS Table 2B Transformer Data 3W Open

Long Term Development Statement Table 2b shows the Transformer information for three...

2 No licence known
Tags: Grid Ltds Primary Transformers
CSV JSON

UK Power Networks 2022-01-27

Flexibility Post Tender Report Open

Currently, this dataset includes past Flexibility Services zones, bids and tender results, namely for February 2021. We believe it will be useful for browsers/data users to see where we have tendered for...

4 No licence known
Tags: Flexibility
CSV JSON ZIP

UK Power Networks 2022-01-27

LTDS Table 8 GT 95 Perc Fault Data Open

Long Term Development Statement Table 8 indicates any Fault Level restrictions or mitigations in place at our Grid and Primary substations. Published 30th November...

2 No licence known
Tags: Ehv Grid Ltds Primary
CSV JSON

UK Power Networks 2022-01-27

EPN BOUNDARY Open

Shapefile showing the UK Power Networks licence area Eastern...

4 No licence known
CSV JSON ZIP

UK Power Networks 2022-01-27

Flood Warning Areas Open

Shapefile showing the areas in England with flood warnings

4 No licence known
CSV JSON ZIP

UK Power Networks 2022-01-27

LTDS Table 2A Transformer 2W Open

Long Term Development Statement Table 2A shows the Transformer information for two winding (1x HV, 1x LV) transformers associated...

2 No licence known
Tags: Grid Ltds Primary Transformers
CSV JSON

UK Power Networks 2022-01-27

Embedded Capacity Register Open

The Embedded Capacity Register (ECR), formerly known as the System Wide Resource Register (SWRR), lists all generation, storage and flexible demand resources where the installed generation capacity, export...

4 No licence known
Tags: Flexible Demand Generation Storage
CSV JSON ZIP

UK Power Networks 2022-01-27

LPN BOUNDARY Open

Shapefile showing the UK Power Networks licence area London Power...

4 No licence known
CSV JSON ZIP

UK Power Networks 2022-01-27

LTDS Table 4A 3ph Fault Level Open

Long Term Development Statement Table 4a shows the 3 phase fault level at each Grid and Primary substation. Published 30th November 2021.

2 No licence known
Tags: Fault Level Ltds
CSV JSON

UK Power Networks 2022-01-27

Grid and Primary Sites Soil Data Open

Soil report data by grid and primary site

2 No licence known
Tags: Earthing Soil Data Thermal Resistivity
CSV JSON

UK Power Networks 2022-01-27

Areas of Outstanding Natural Beauty England Open

Shapefile showing areas of outstanding natural beauty

4 No licence known
CSV JSON ZIP

UK Power Networks 2022-01-27

UKPN BOUNDARY Open

Shapefile showing the UK Power Networks boundary

4 No licence known
CSV JSON ZIP

UK Power Networks 2022-01-27

Flexibility LV Zones Open

Flexibility services competition shapefile and zone dataset for LV.For live flexibility services tenders, please visit

4 No licence known
Tags: Flexibility
CSV JSON ZIP

UK Power Networks 2022-01-27

Constraint Breakdown Costs and Volume Open

The publication consists of constraint breakdown information to provide additional transparency of why as ESO we are taking actions on the system. Please note that tags applied to actions can occasionally be...

5 ESO
Tags: Contstraints Costs Daily Inertia Rocof Subscribable Thermal Voltage Volumes
CSV

National Grid ESO 2022-01-26

Thermal Constraint Costs Open

Thermal constraints are taken when the amount of energy that would flow naturally from one region to another exceeds the capacity of the circuits connecting the two regions. This dataset provides outturn...

7 ESO
Tags: Constraints Costs Diagrams Network Outturn Subscribable Thermal
CSV PNG XLSX

National Grid ESO 2022-01-26

Monthly Balancing Services Use of System (BSUoS) Forecast Data Open

The Balancing Services Use of System (BSUoS) costs are reported on a monthly basis with a forecast for the next month and a rolling 24 month period. Here you can find the data for the 24 month ahead forecast....

86 ESO
Tags: Balancing Bsuos Cost Forecast Monthly Subscribable
CSV PDF XLSX

National Grid ESO 2022-01-26

ESO Operational Transparency Forum Open

The Electricity National Control Centre (ENCC) are focused on protecting customers and stakeholders from operational risk across the COVID-19 period and beyond. We are aware that further transparency on our...

191 ESO
Tags: Covid-19 Preparedness Subscribable Webinar
MP4 PDF Unknown VIDEO XLSX

National Grid ESO 2022-01-26

Dispatch Transparency Open

This dataset is a component of the Forward Plan 2020-21 commitment to increase the transparency of our operational decision making in the Balancing Mechanism (BM). It includes the publication of actions taken...

4 ESO
Tags: Balancing Bm Boa Dispatch Dispatch Transparency Mechanism Operational Subscribable Transparency
CSV PDF PNG

National Grid ESO 2022-01-26

Monthly Balancing Services Use of System (BSUoS) Forecast Reports Open

The Balancing Services Use of System (BSUoS) costs are reported on a monthly basis with a forecast for the next month and a rolling 24 month period. Here you can find the report created each month which...

55 ESO
Tags: Balancing Bsuos Cost Forecast Monthly Subscribable
PDF

National Grid ESO 2022-01-26

Power Quality Data Open

A sample of Power Quality Data for available Grid and Primary sites.

2 No licence known
Tags: Grid Harmonics Primary
CSV JSON

UK Power Networks 2022-01-26

LTDS Table 3A Load Data Observed Open

Long Term Development Statement Table 3A shows the observed substation peak demands with no correction for demand served by generation. Published 30th November 2021.

2 No licence known
Tags: Demand Forecast Ltds Primary
CSV JSON

UK Power Networks 2022-01-26

LTDS Table 3B Load Data True Open

Long Term Development Statement Table 3B shows the true substation peak demands with correction added for demand served by generation. Published 30th November 2021.

2 No licence known
Tags: Demand Forecast Ltds Primary
CSV JSON

UK Power Networks 2022-01-26

Documents Library Open

This is where you will find all our documentation relating to datasets within the Open Data Portal, and other documents such as, our Open Energy Data Maturity assessment - which indicates our baseline...

2 No licence known
Tags: Documents
CSV JSON

UK Power Networks 2022-01-26

Transmission Entry Capacity (TEC) Register Open

A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National...

1 ESO
Tags: Connection Register Subscribable Tec
CSV

National Grid ESO 2022-01-25

Interconnector Register Open

A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects. ...

1 ESO
Tags: Connection Interconnector Register Subscribable
CSV

National Grid ESO 2022-01-25

Embedded Register Open

A list of connected or contracted to connect embedded generation projects in Scotland. ...

1 ESO
Tags: Connection Embedded Register Subscribable
CSV

National Grid ESO 2022-01-25

Week Ahead Overnight Voltage Requirement Open

The number of voltage machine required for a given voltage group for upcoming weekend and following Monday to Friday. Given the complexity and locational nature of the voltage requirement, the actual...

4 ESO
Tags: Constraint Group Last Updated Management Note Subscribable Units Voltage
CSV PDF

National Grid ESO 2022-01-21

Daily Balancing Services Use Of System (BSUoS) Historic & Forecast Costs Open

The data set shows the daily costs outturn per category associated with balancing the system for the year to date, and the daily forecast costs for the following financial year. In the dataset the category...

4 ESO
Tags: Balancing Bsuos Cost Daily Forecast Historic Outturn Subscribable
CSV

National Grid ESO 2022-01-21

Western Power Distribution Data Challenge 2: Estimating EV Charger Demand Open

This is the second of three Western Power Distribution (WPD) short data challenges! The aims of these challenges include: 1. Demonstrating the value in making data openly available 2. Increasing the...

4 wpd-open-data
Tags: Challenge Demand Estimation Ev Time Series
Unknown ZIP

Western Power Distribution 2022-01-19

24 Months Ahead Constraint Limits Open

This dataset contains Mega Watt constraint limits for the main boundaries on the transmission system on weekly bases for 24 months ahead.

3 ESO
Tags: Constraint Limits Scotex Ssharn3
CSV PDF

National Grid ESO 2022-01-19

Data Portal: Planned Changes & Known Issues Open

Here you will find details of upcoming changes to the ESO Data Portal along with any known issues that we are working to resolve. If you have encountered any issues not captured in this table please report...

1 ESO
Tags: Changes Issues Planned Subscribable
CSV

National Grid ESO 2022-01-19

Day Ahead Half Hourly Demand Forecast Performance Open

The historic half hourly day ahead national demand forecast as published via BM reports, alongside the outturn values, adjustments for TRIAD avoidance estimates and Absolute Percentage Error (APE) for each...

1 ESO
Tags: Day Ahead Demand Forecast
CSV

National Grid ESO 2022-01-19

Firm Frequency Response (FFR) Post Tender Reports Open

The Firm Frequency Response (FFR) post tender reports are published following each monthly tender. They indicate which tenders were accepted and rejected and the information submitted for these tenders. Reason...

47 ESO
Tags: Balancing Contract Ffr Firm Frequency Response Service Subscribable Tender
CSV Unknown XLSM XLSX

National Grid ESO 2022-01-19

Obligatory Reactive Power Service (ORPS) Open

The obligatory reactive power service (ORPS) is the provision of varying reactive power output. At any given output generators may be requested to produce or absorb reactive power to help manage system...

5 ESO
Tags: Ancillary Balancing Obligatory Orps Power Reactive Service Subscribable Utilisation
CSV PDF XLSX

National Grid ESO 2022-01-18

UK Renewable Power Plants Open

1 Creative Commons Attribution
Tags: Powerplants Renewable
CSV

BEIS 2022-01-17

Embedded Capacity Register Open

All distributed generation with a capacity of 1MW or above captured in a consolidated format including generator type, location, capacity and wider key information.

15 wpd-open-data
Tags: Capacity Chp Export Generation Mpan Pv Solar Wind
CSV

Western Power Distribution 2022-01-14

Generation Capacity Register Open

The Generation capacity register lists generators that: - Are connected to our network ("Connected") - Have accepted offers to connect to our network ("Accepted-not-yet-Connected") - Have received offers...

16 wpd-open-data
CSV

Western Power Distribution 2022-01-14

Fault Level Open

Fault level data encompassing system impedance, calculated fault levels and ratings.

2 wpd-open-data
Tags: Break Fault Make Ratings
CSV

Western Power Distribution 2022-01-14

Voltage System Costs Open

To give greater insight on balancing decisions, this post monthly report provides outturn system costs for maintaining voltage levels on the network. Maintaining the electricity system at the correct voltages...

9 ESO
Tags: Cost Diagram Network Subscribable System Voltage
CSV PDF

National Grid ESO 2022-01-14

Monthly Operational Metered Wind Output Open

Metered Wind Output in MW for 'Scotland' and 'England and Wales'. Output is provided per date per Settlement Period. Please note that this data is from operational metering and is therefore expected to be...

4 ESO
Tags: England Monthly Output Scotland Subscribable Wind
CSV

National Grid ESO 2022-01-14

Western Power Distribution Data Challenge 1: High Resolution Peak Estimation Open

This is the data for the first of three Western Power Distribution (WPD) short data challenges! The aims of these challenges include: - Demonstrating the value in making data openly available - Increasing...

5 wpd-open-data
Tags: Challenge Demand Estimation Export Generation Time Series
Unknown ZIP

Western Power Distribution 2022-01-13

Common Information Model LTDS Open

The Common Information Models (CIM) provide a complete and consolidated view of our network assets and their connectivity. The models bring together a huge range of datasets from different types of energy...

5 wpd-open-data
Tags: Cim
PDF ZIP

Western Power Distribution 2022-01-12

System Frequency Open

This page holds the historic system frequency data for Great Britain at a 1 second resolution. It is the role of the National Grid ESO to keep the system frequency at 50 Hz, with a statutory limit of 0.5 Hz...

36 ESO
Tags: Frequency Historic Subscribable System
CSV

National Grid ESO 2022-01-07

Monthly Balancing Services Summary (MBSS) Open

The Monthly Balancing Services Summary (MBSS) gives the costs and volumes of balancing services used by the Electricity System Operator. These costs are broken into individual months in the past financial...

77 ESO
Tags: Ancillary Balancing Constraints Mbss Monthly Reserve Services Stor Subscribable Trades
CSV PDF XLSX

National Grid ESO 2022-01-04

2021 Flexibility Dispatch Report Open

Report showing the published need, offered, accepted and dispatched volumes of flexibility services by WPD up to the end of November 2021

1 wpd-open-data
CSV

Western Power Distribution 2021-12-24

2021 Flexibility Dispatch Report Open

Report showing the published need, offered, accepted and dispatched volumes of flexibility services by WPD up to the end of November 2021.

1 wpd-open-data
Tags: Dso Flexibility
CSV

Western Power Distribution 2021-12-23

Transmission Network Use of System (TNUoS) Tariffs Open

This dataset contains a breakdown of all the Transmission Network Use of System (TNUoS) tariff elements of which are forecasted and set by the revenue team at National Grid ESO. These files will be updated on...

6 ESO
Tags: Charging Demand Embedded Export Generator Revenue Subscribable Tarifs Tnuos
CSV

National Grid ESO 2021-12-22

Future Energy Scenario (FES) Building Block Data Open

We have been working with the other network companies as part of the Energy Networks Association (ENA) Open Networks project. The Whole System Electricity Future Energy Scenarios (FES) part of this work seeks...

4 ESO
Tags: Bulding Blocks Capacity Defs Demand Energy Fes Fes2020 Fes2021 Future Generation Scenarios Subscribable
CSV

National Grid ESO 2021-12-17

Reinforcement Open

WPD Reinforcement of work currently planned on the EHV system and above.

1 wpd-open-data
CSV

Western Power Distribution 2021-12-16

New Connections Open

Interest in Connections for Budgets & Offers encompassing parameters including Size and number.

1 wpd-open-data
CSV

Western Power Distribution 2021-12-16

Circuit Data Open

This data set contains the electrical parameters for circuits operating between 132kV and 6.6kV.

2 wpd-open-data
Tags: Circuit Impedance Ratings
CSV

Western Power Distribution 2021-12-16

Busbar Nodes Open

Busbar Node Codes used in the presentation of system data including locational Area and voltage connected.

1 wpd-open-data
CSV

Western Power Distribution 2021-12-16

Load Forecast Open

This dataset contains a forecast of load for five years ahead.

2 wpd-open-data
Tags: Forecast Load
CSV

Western Power Distribution 2021-12-16

Transformer Data Open

Electrical parameters of transformers for all licence areas.

3 wpd-open-data
Tags: Impedance Ratings Transformer
CSV

Western Power Distribution 2021-12-16

Phase 2: FFR Auction Results Summary Open

As part of our work on developing our balancing services we are running a weekly trial auction for Firm Frequency Response. The weekly auction trial results and order hash data are available...

20 ESO