Title Owner Updated

Interconnector Requirement and Auction Summary Data

National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain to help manage system issues such as Rate Of Change Of Frequency (ROCOF), thermal constraints...

1 ESO

Tags: Auction Bid Bidding Britned Gtma Ic Ifa Ifa2 Interconnector Nemo Powerbi Requirement Sch7a Schedule 7a Subscribable Trades Trading

CSV Open

National Grid ESO 2022-08-12

Short Term Operating Reserve (STOR) Day Ahead Auction Results

As part of Clean Energy Package (CEP) 6.9 we will be running daily auction for procurement of Short Term Operating Reserve (STOR). The daily results from the auction are available here.

1 ESO

Tags: Cep 6.9 Day Ahead Day Ahead Results Powerbi Results Stor Subscribable

CSV Open

National Grid ESO 2022-08-12

Embedded Wind and Solar Forecasts

Electricity System Operator (ESO) publishes at a half-hourly resolution the embedded (refer to embedded document for definition) wind and solar forecast from within day up to 14 days ahead. This forecast gets...

2 ESO

Tags: Embedded Forecast Generation Powerbi Solar Subscribable Wind

CSV DOC Open

National Grid ESO 2022-08-12

Daily Operational Planning Margin Requirement (OPMR)

When assessing and publishing generation availability information against system requirements, Electricity System Operator (ESO) includes an Operational Planning Margin Requirement (OPMR) above the demand...

1 ESO

Tags: Daily Forecast Generation Margin Opmr Powerbi Reserve Subscribable

CSV Open

National Grid ESO 2022-08-12