Constraint Breakdown Costs and Volume
Overview
The publication consists of constraint breakdown information to provide additional transparency of why as ESO we are taking actions on the system. Please note that tags applied to actions can occasionally be changed post event and in this instance the information in this dataset would be refreshed to reflect the up to date information.
Additional Information
Key | Value |
---|---|
Update Frequency | Weekly |
Files
Constraint Breakdown 2017-2018
This file contains a breakdown of constraint actions into the following categories - Inertia (reducing largest loss and increasing system inertia), Voltage, and Thermal. Costs and Volumes are shown.
Constraint Breakdown 2018-2019
This file contains a breakdown of constraint actions into the following categories - Inertia (reducing largest loss and increasing system inertia), Voltage, and Thermal. Costs and Volumes are shown.
Constraint Breakdown 2019-2020
This file contains a breakdown of constraint actions into the following categories - Inertia (reducing largest loss and increasing system inertia), Voltage, and Thermal. Costs and Volumes are shown.
Constraint Breakdown 2020-2021
This file contains a breakdown of constraint actions into the following categories - Inertia (reducing largest loss and increasing system inertia), Voltage, and Thermal. Costs and Volumes are shown.
Constraint Breakdown 2021-2022
This file contains a breakdown of constraint actions into the following categories - Inertia (reducing largest loss and increasing system inertia), Voltage, and Thermal. Costs and Volumes are shown.
Constraint Breakdown 2022-2023
This file contains a breakdown of constraint actions into the following categories - Inertia (reducing largest loss and increasing system inertia), Voltage, and Thermal. Costs and Volumes are shown.
Related Dataset from National Grid ESO (view all)
National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain...
The dataset contains national wind forecast over a day ahead timescale as well as all historic day ahead wind...
As part of Clean Energy Package (CEP) 6.9 we will be running daily auction for procurement of Short Term Operating...
Other Datasets tagged costs, volumes, voltage, subscribable, daily, inertia, rocof, thermal, contstraints (view all)
Thermal constraints are taken when the amount of energy that would flow naturally from one region to another exceeds...
Index Linked Contract can be used by National Grid ESO to meet the [voltage...
National Grid ESO
View allAccess and Licensing
Access conditions
Any controls, requirements, or pre-requisites surrounding access to data
Licence conditions
ESO
Data Quality
Aggregation Method
Any controls, requirements, or pre-requisites surrounding access to data
Organisational Lineage
The licensing conditions controlling access to the data
Risks
Considerations, risks, and constraints around making assumptions based on specific datasets. e.g data health score
Confidence Level
The level of confidence associated with a specific dataset
Units
The units in which energy is described within a dataset