Daily Operational Planning Margin Requirement (OPMR)

Recently Updated
Open
Update frequency

Daily (weekdays)

Last updated

2021-12-06

Format

CSV

Project Overview

When assessing and publishing generation availability information against system requirements, Electricity System Operator (ESO) includes an Operational Planning Margin Requirement (OPMR) above the demand forecast for 2 to 13 days ahead. This OPMR is the amount of generation, in excess of demand forecast, that is required to meet Electricity System Operator's (ESO) Reserve Requirement.

Daily, Forecast, Generation, Margin, Opmr, Powerbi, Reserve, Subscribable
Key Value
Update Frequency Daily (Weekdays)

Access and Licensing

Access conditions

Any controls, requirements, or pre-requisites surrounding access to data

Licence conditions

ESO

Data Quality

Aggregation Method

Any controls, requirements, or pre-requisites surrounding access to data

Organisational Lineage

The licensing conditions controlling access to the data

Risks

Considerations, risks, and constraints around making assumptions based on specific datasets. e.g data health score

Confidence Level

The level of confidence associated with a specific dataset

Units

The units in which energy is described within a dataset

Related Dataset from National Grid ESO (view all)

National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain...

The dataset contains national wind forecast over a day ahead timescale as well as all historic day ahead wind...

As part of Clean Energy Package (CEP) 6.9 we will be running daily auction for procurement of Short Term Operating...

Other Datasets tagged opmr, reserve, forecast, PowerBI, generation, margin, subscribable, daily (view all)

When assessing and publishing generation availability information against system requirements, Electricity System...

This dataset contains NRAPM (Negative Reserve Active Power Margin) forecast for Daily 2-14 days ahead and Weekly for...

Super Stable Export Limit (SEL) is utilised to directly decrease the sum of the minimum MW level or SEL of...

National Grid ESO

The electricity distribution network operator for the Midlands, South Wales and the South West.

View all Follow Message

Datasets

.CSV

Daily Operational Planning Margin Requirement

The daily Operational Planning Margin Requirement (OPMR) is published on a daily basis and contains a view of 2-14 days ahead forecast for the OPMR.