Project Overview

A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects.


Note: The Mega Watt (MW) Total MW Import figures represent firm Transmission Entry Capacity (TEC). Moyle holds a total of 500MW TEC which is subject to operational restrictions


CUSC Definitions

Connection and Use of System Code (CUSC) Definition paragraph 9.4 EXPORT OF POWER FROM THE INTERCONNECTOR CONNECTION SITE * MW Import: Subject to the other provisions of the CUSC, the relevant Bilateral Connection Agreement and the Grid Code and any Operating Agreement, The Company shall accept into the National Electricity Transmission System at the connection site of an Interconnector power up to the Transmission Entry Capacity and (if any) Short-Term Transmission Entry Capacity (STTEC) and\or Limited Duration Transmission Entry Capacity (LDTEC) and\or any Temporary Received TEC less any Temporary Donated TEC for the relevant Period as specified in Appendix C to the relevant Bilateral Connection Agreement except to the extent (if any) that The Company is prevented from doing so by transmission constraints which could not be avoided by the exercise of Good Industry Practice.

CUSC Definition paragraph 9.5 IMPORT OF POWER TO THE INTERCONNECTOR CONNECTION SITE * MW Export: Subject to the other provisions of the CUSC, the relevant Bilateral Connection Agreement, the Grid Code and any Operating Agreement, The Company shall transport a supply of power to a Connection Site of an Interconnector through the National Electricity Transmission System up to the amount specified in the Bilateral Connection Agreement except to the extent (if any) that The Company is prevented from doing so by transmission constraints which could not be avoided by the exercise of Good Industry Practice by The Company.

Connection, Interconnector, Register, Subscribable
Key Value
Update Frequency Twice weekly
harvest_object_id fdb15e87-b608-4a25-82d4-1219f179f3f0
harvest_source_id 916f7f66-3a3b-43e9-afc0-85d31134d7b3
harvest_source_title National Grid ESO

Access and Licensing

Access conditions

Any controls, requirements, or pre-requisites surrounding access to data

Licence conditions

ESO

Data Quality

Aggregation Method

Any controls, requirements, or pre-requisites surrounding access to data

Organisational Lineage

The licensing conditions controlling access to the data

Risks

Considerations, risks, and constraints around making assumptions based on specific datasets. e.g data health score

Confidence Level

The level of confidence associated with a specific dataset

Units

The units in which energy is described within a dataset

Related Dataset from National Grid ESO (view all)

The dataset contains national wind forecast over a day ahead timescale as well as all historic day ahead wind...

As part of Clean Energy Package (CEP) 6.9 we will be running daily auction for procurement of Short Term Operating...

This dataset contains national carbon intensity forecast for the GB electricity system. The carbon intensity of...

Other Datasets tagged subscribable, connection, register, interconnector (view all)

A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and...

A list of connected or contracted to connect embedded generation projects in Scotland. ...

National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain...

National Grid ESO

The electricity distribution network operator for the Midlands, South Wales and the South West.

View all Follow Message

Datasets

.CSV

Interconnector Register

This data file contains the latest version of the Interconnector Register including all changes up to publication. This file will be updated twice weekly on Tuesdays and Fridays.