Daily & Weekly NRAPM (Negative Reserve Active Power Margin) Forecast

Recently Updated
Open
Update frequency

Daily

Last updated

2021-12-06

Format

CSV

Project Overview

This dataset contains NRAPM (Negative Reserve Active Power Margin) forecast for Daily 2-14 days ahead and Weekly for 2-52 weeks ahead for both National and Scotland. The purpose of the NRAPM forecast is to indicate to the market a risk of NRAPM situation and therefore risk of Emergency Instructions.

The insufficient NRAPM warning (Negative Reserve Active Power Margin) is a request to encourage more flexible parameters from generators, and inform participants of a risk of emergency instructions. A system NRAPM may be issued if there is insufficient flexibility available to ensure that generation matches demand during low demand periods.

Daily, Forecast, Margin, Nrapm, Subscribable, Weekly
Key Value
Update Frequency Daily

Access and Licensing

Access conditions

Any controls, requirements, or pre-requisites surrounding access to data

Licence conditions

ESO

Data Quality

Aggregation Method

Any controls, requirements, or pre-requisites surrounding access to data

Organisational Lineage

The licensing conditions controlling access to the data

Risks

Considerations, risks, and constraints around making assumptions based on specific datasets. e.g data health score

Confidence Level

The level of confidence associated with a specific dataset

Units

The units in which energy is described within a dataset

Related Dataset from National Grid ESO (view all)

National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain...

The dataset contains national wind forecast over a day ahead timescale as well as all historic day ahead wind...

As part of Clean Energy Package (CEP) 6.9 we will be running daily auction for procurement of Short Term Operating...

Other Datasets tagged weekly, forecast, nrapm, margin, subscribable, daily (view all)

When assessing and publishing generation availability information against system requirements, Electricity System...

When assessing and publishing generation availability information against system requirements, Electricity System...

This file contains the Electricity System Operator's (ESO) half-hourly BSUoS forecast (Balancing Services Use of...

National Grid ESO

The electricity distribution network operator for the Midlands, South Wales and the South West.

View all Follow Message

Datasets

.CSV

National Daily 2-14 days NRAPM Forecast

Forecast Megawatt (MW) away from risk of system level NRAPM (Negative Reserve Active Power Margin) Forecast Conditions for 2-14 days ahead for overnight daily minimum 1B and daily minimum 3B.

.CSV

Scotland Daily 2-14 days NRAPM Forecast

Forecast Megawatt (MW) away from risk of Scotland Level NRAPM (Negative Reserve Active Power Margin) forecast conditions for 2-14 days ahead for overnight daily minimum 1B and daily minimum 3B.

.CSV

Weekly 2-52 week National NRAPM Forecast

Probability of seeing a load factor on Wind that would cause a National NRAPM (Negative Reserve Active Power Margin)

.CSV

Weekly 2-52 week Scotland NRAPM forecast

Probability of seeing a load factor on wind that would cause an NRAPM (Negative Reserve Active Power Margin) in Scotland