Project Overview

To give greater insight on balancing decisions, this post monthly report provides outturn system costs for maintaining voltage levels on the network. Maintaining the electricity system at the correct voltages enables safe and efficient power transfer across the network. This requires the right balance of reactive power injection and absorption to be maintained in real time.


Note: Please note the utilisation costs presented here are only the ORPS payments, allocated per voltage constraint group

Cost, Diagram, Network, Subscribable, System, Voltage
Key Value
Update Frequency Monthly

Access and Licensing

Access conditions

Any controls, requirements, or pre-requisites surrounding access to data

Licence conditions

ESO

Data Quality

Aggregation Method

Any controls, requirements, or pre-requisites surrounding access to data

Organisational Lineage

The licensing conditions controlling access to the data

Risks

Considerations, risks, and constraints around making assumptions based on specific datasets. e.g data health score

Confidence Level

The level of confidence associated with a specific dataset

Units

The units in which energy is described within a dataset

Related Dataset from National Grid ESO (view all)

National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain...

The dataset contains national wind forecast over a day ahead timescale as well as all historic day ahead wind...

As part of Clean Energy Package (CEP) 6.9 we will be running daily auction for procurement of Short Term Operating...

Other Datasets tagged diagram, network, cost, voltage, system, subscribable (view all)

The National Grid Electricity System Operator (ESO) publishes an annual report on the performance of the National...

A snapshot of the limits and flows at relevant boundaries at day ahead stage. These flow values are true for when...

Thermal constraints are taken when the amount of energy that would flow naturally from one region to another exceeds...

National Grid ESO

The electricity distribution network operator for the Midlands, South Wales and the South West.

View all Follow Message

Datasets

.CSV

Historical Outturn Voltage Costs 2014-2015

This provides outturn system costs for maintaining voltage levels on the network, along with a network diagram which displays the different voltage requirement areas.

.CSV

Historical Outturn Voltage Costs 2015-2016

This provides outturn system costs for maintaining voltage levels on the network, along with a network diagram which displays the different voltage requirement areas.

.CSV

Historical Outturn Voltage Costs 2016-2017

This provides outturn system costs for maintaining voltage levels on the network, along with a network diagram which displays the different voltage requirement areas.

.CSV

Historical Outturn Voltage Costs 2017-2018

This provides outturn system costs for maintaining voltage levels on the network, along with a network diagram which displays the different voltage requirement areas.

.CSV

Historical Outturn Voltage Costs 2018-2019

This provides outturn system costs for maintaining voltage levels on the network, along with a network diagram which displays the different voltage requirement areas.

.CSV

Historical Outturn Voltage Costs 2019-2020

This provides outturn system costs for maintaining voltage levels on the network, along with a network diagram which displays the different voltage requirement areas.

.CSV

Historical Outturn Voltage Costs 2020-2021

This provides outturn system costs for maintaining voltage levels on the network, along with a network diagram which displays the different voltage requirement areas.

.PDF

Network Diagram

A network diagram of Voltage Requirement Area

.CSV

Outturn Voltage Costs 2021-2022

This provides outturn system costs for maintaining voltage levels on the network, along with a network diagram which displays the different voltage requirement areas.