Thermal Constraint Costs
Owner
Update frequency
Daily (weekdays)
Last updated
2022-05-20
Format
CSV PNG XLSX
Overview
Thermal constraints are taken when the amount of energy that would flow naturally from one region to another exceeds the capacity of the circuits connecting the two regions. This dataset provides outturn system costs for thermal constraints across a number of significant constraint boundaries.
Additional Information
Key | Value |
---|---|
Update Frequency | Daily (Weekdays) |
Files
Thermal Constraint Costs 19-20
Out turn system costs for thermal constraints across a number of significant constraint boundaries for 19-20 financial year. The geographic locations of the constraint groups are shown in the network diagrams below.
Thermal Constraint Costs 20-21
Out turn system costs for thermal constraints across a number of significant constraint boundaries for 20-21 financial year. The geographic locations of the constraint groups are shown in the network diagrams below.
Network Diagram England & Wales
The Network Diagram for England & Wales showing the locations of the constraints contained in the thermal constraints data. This file shows the location of the SCOTEX, SSHARN, SWALEX, SEIMP and ESTEX constraint groups.
The Network Diagram for Scotland showing the locations of the constraints contained in the thermal constraints data. This file shows the location of the SSE-SP constraint group.
The geographic locations of the constraint groups are shown in this map.
Thermal Constraint Costs Data 21-22
Out turn system costs for thermal constraints across a number of significant constraint boundaries for 21-22 financial year.
Thermal Constraint Costs Data 22-23
Out turn system costs for thermal constraints across a number of significant constraint boundaries for 22-23 financial year.
Related Dataset from National Grid ESO (view all)
National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain...
The dataset contains national wind forecast over a day ahead timescale as well as all historic day ahead wind...
As part of Clean Energy Package (CEP) 6.9 we will be running daily auction for procurement of Short Term Operating...
Other Datasets tagged outturn, constraints, costs, subscribable, diagrams, network, thermal (view all)
The publication consists of constraint breakdown information to provide additional transparency of why as ESO we are...
A snapshot of the limits and flows at relevant boundaries at day ahead stage. These flow values are true for when...
This section contains historic electricity demand, interconnector, hydro storage pumping, Non-BM Short Term...
National Grid ESO
View allAccess and Licensing
Access conditions
Any controls, requirements, or pre-requisites surrounding access to data
Licence conditions
ESO
Data Quality
Aggregation Method
Any controls, requirements, or pre-requisites surrounding access to data
Organisational Lineage
The licensing conditions controlling access to the data
Risks
Considerations, risks, and constraints around making assumptions based on specific datasets. e.g data health score
Confidence Level
The level of confidence associated with a specific dataset
Units
The units in which energy is described within a dataset