Project Overview

There are a number of factors which influence transmission losses.  These include variations in zonal generation patterns, growth in northern vs southern generation, level of Scottish exports to England and Wales, changes in interconnector flows, level of partly loaded plant, reduced flows directly out of concentrations of generation (e.g. Drax, South Humber Bank, Killingholme), the degree of geographic dispersal of plant and also levels of demand growth.

The configuration of the Transmission System, the geographic profile of operating voltages, and the characteristics of individual items of transmission equipment also influence losses.

It is difficult for National Grid ESO to forecast future losses because many of the above factors are outside its control.  Generally losses are very sensitive to the geographic generation pattern, and small changes in the north / south balance can have a significant impact on the overall transmission loss volumes from day to day and year to year.

Post event, National Grid ESO monitors transmission losses incurred as a result of operating the transmission system.  Normally network configuration and voltage profile are dictated by security, quality and safety considerations and the resulting configuration may or may not act to reduce losses. 

We always aim to operate the GB transmission system as efficiently and economically as possible in accordance with our licence conditions.  Wherever possible we will despatch plant to minimise the overall cost of operating the system.  Decisions taken to achieve this in the optimal manner overall may also indirectly result in lower transmission losses, but generally, the optimisation of transmission losses will not result in the system being operated in the most economic way, and would be likely to increase costs significantly.  An example of this would be dispatching more expensive out of merit plant in the south to back off high north to south flows and reduce loadings on heavily loaded circuits which are contributing to higher transmission losses.

Please note: We have used an average SSP price of £50/MWh to calculate the cost of losses as price multiplied by volume.  If another price is considered more appropriate, the cost can easily be adjusted to reflect a different average price.

Losses, Subscribable, Transmission
Key Value
Update Frequency Annually

Access and Licensing

Access conditions

Any controls, requirements, or pre-requisites surrounding access to data

Licence conditions

ESO

Data Quality

Aggregation Method

Any controls, requirements, or pre-requisites surrounding access to data

Organisational Lineage

The licensing conditions controlling access to the data

Risks

Considerations, risks, and constraints around making assumptions based on specific datasets. e.g data health score

Confidence Level

The level of confidence associated with a specific dataset

Units

The units in which energy is described within a dataset

Related Dataset from National Grid ESO (view all)

National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain...

The dataset contains national wind forecast over a day ahead timescale as well as all historic day ahead wind...

As part of Clean Energy Package (CEP) 6.9 we will be running daily auction for procurement of Short Term Operating...

Other Datasets tagged transmission, losses, subscribable (view all)

This dataset contains an estimate of the outturn inertia and market provided inertia for Great Britain Transmission System.

National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain...

The dataset contains national wind forecast over a day ahead timescale as well as all historic day ahead wind...

National Grid ESO

The electricity distribution network operator for the Midlands, South Wales and the South West.

View all Follow Message

Datasets

.CSV

Transmission Losses

This file contains monthly volumes and costs of transmission losses for NGET, Scottish Power and Scottish Hydro Electric Transmission Systems. The data will be updated on an annual basis.

.CSV

Financial Year Losses

This file contains the Financial Year Losses for the transmission system. The data will be updated on an annual basis.